Adoption Roadmap
From ratification to national pilots in twelve months
Overview
This roadmap sequences the minimum viable path to planetary adoption. Each phase locks invariants, publishes attestations, and expands governance participation, while preserving a single source of canonical truth under Standard-817 and SOSL.
12-Month Timeline
Phases & Milestones
Phase I — Ratification (Months 1–2)
- Freeze ontology (817.2) and Holo-Proof specification.
- Publish SOSL v1.0 reference and covenant tests.
- Establish Council registrar and ballot schema.
Phase II — Incarnation (Months 3–4)
- MVR: single-file PWA with 3 active Articles (I, V, IX).
- Attestation Hub online; public proof bundles nightly.
- Seed institutions sign on (academia + civic).
Phase III — Adjudication (Months 7–8)
- Policy Arbitration Engine (PAE) live.
- Five cross-jurisdiction scenarios (GDPR/CCPA/PDPA…)
- InfinityWipe revocation channels operational.
Phase IV — Proliferation (Months 11–12)
- National pilots: finance, academia, health.
- Open conformity registry; TRQ/H-index visible.
- Quarterly ballots for standard evolution.
Mini-Gantt (workstreams)
Key Performance Indicators
KPI | Target | Measured by |
---|---|---|
Attestation Completeness | > 0.95 | Daily proof bundle audit |
Revocation Lag | < 2h | InfinityWipe channel latency |
Spec Conformance | 100% for Articles I, V, IX, X | 817.2 test vectors |
Jurisdiction Coverage | 5 frameworks | PAE scenarios verified |
Council Participation | ≥ 20 institutions | Ballot registry |
TRQ Median | ≥ 0.80 | TRQ computation (public) |
Risk Register
R1 — Spec Drift
Impact: Forked invariants / incompatible tooling.
Mitigation: LogicSeal commits; ballots required for changes; version gates in capability descriptors.
R2 — Regulatory Clash
Impact: Conflicting obligations across jurisdictions.
Mitigation: PAE precedence matrix; case library; opt-in sovereign enclaves.
R3 — Adversarial Integrations
Impact: Shadow deployments, false attestations.
Mitigation: Council mirroring, ΔΣ overlays, public nullification feeds.
R4 — PQC Transition Risk
Impact: Algorithmic deprecation.
Mitigation: Hybrid QSS (Dilithium/SPHINCS+), key rotation attestations.
R5 — Data Linkage
Impact: Cross-context deanonymization.
Mitigation: GhostFrame epochs; consent scoping in UCL.
R6 — Talent Bottleneck
Impact: Slow implementation velocity.
Mitigation: OSS onboarding tracks; fellowship program with academia.
Dependencies
Dependency | Required For | Status |
---|---|---|
817.2 Ontology Freeze | All Engines & Tools | Phase I exit |
PQE Suite (QSS) | Attestations | Phase II |
PAE v1 | Cross-border scenarios | Phase III |
InfinityWipe Channels | Revocations | Phase III |
Council Registrar | Ballots & mirroring | Phase I |
Release Plan
v2.0.0 — Genesis
- Spec freeze (817.2), SOSL v1.0, MVR PWA.
- Articles I/V/IX enforced; Attestation Hub online.
v2.1.0 — Adjudication
- PAE v1; five cross-jurisdiction demos.
- InfinityWipe & public nullification feeds.
v2.2.0 — Proliferation
- National pilots; TRQ/H-index dashboards.
- Quarterly ballots for standard evolution.
What Reaches Day-1
- Canonical 817.2 ontology + covenant tests.
- Three operational Articles (I, V, IX) with open proofs.
- Attestation Hub and public proof bundles.
- PAE backlog, case library seeds, and ΔΣ overlays.